Tag archives for drywall

Renovation Story: Drywall

I can’t even describe how exciting it was to see the drywall going up, once the demolition, framing, and repair were complete.

I promise to make this post extra special by including more before and after photos so that you can see the transformation of the space. If you are new to my blog, you can catch up on the rest of the Renovation Story here.

This is a view of the first room of the home, the living room, as it opens up to the kitchen. For the large entryways on either side, I was inspired by a local area homes and the intention to insert a see thru-direct vent gas fireplace in the future.

At the moment, plans to install the gas fireplace are undecided because we were not sure if a future buyer may prefer to use the wall space for a television or artwork.

For us, the transformation from demo through drywall was a real turning point in the design process.

Remember the crowded kitchen corner? Here it is after reframing and drywall. You can see how we actually expanded the space to include the former bathroom and shifted a window over a few feet to provide some natural lighting on the north side of the kitchen.

Later, you will notice the farmhouse sink will be centered on this window.

A large doorway leads from the right hand side of the kitchen to the sitting room.

This additional side room ended up being the largest in the home based on the square footage. I feel that this room could be used in many ways: a home office, dining room, sitting room, den or even additional bedroom.

As you can see we made the decision to line up all the doors on the right hand side of the home. This is consistent with the layout that would be found in a shot gun home of any era.

Drywall installation meant that the real fun as a designer: Floors, Trims, and Material finishes were soon to come.

Also, you may have noticed the beginnings of a lighting plan emerging in the drywall ceiling photos.  Next, I will begin to share the recessed lighting schedule along with the material and trim selections for the home.

If it seems like everything was happening at once, it really was! Just wait until you see the exterior changes that were happening at this time.

 

Posted in Interior Design | Leave a comment

Renovation Story: Demolition Part 4

You may be wondering…how all the construction work began and what was left of the house after the demolition?

First of all, we needed to strip everything down to the studs in order to preserve the original historic footprint of the home. We preserved framing and structural supports when the wood was in good condition. We removed everything from drywall to ceilings to sub-flooring.

You may remember that this hallway would be one of the largest changes within the floor plan.

We prepared to move the original bathroom into the hallway to enlarge the kitchen and serve as a guest bath.

Then, we would include a Master Bathroom within the remaining hallway space. Below you can see the new framing for the Master Bathroom and the Guest Bathroom  is framed out directly behind it.

Below is a segment of the original spacious hallway that I shared pictures of last week. The original floor tiles pictured which were in not able to be reused.

Next, a small transitional space leads from the Master Bathroom to the Master Bedroom.

All other areas of the home needed equal reconstruction through demolition. Some were in a state of disrepair!  As I am writing this, I am really appreciating the amount of work my contractor took on! In the front of the house the living room had been used as a bedroom and needed considerable demolition.

The crumbling chimney and fireplace in the living room was a major concern to our HVAC installer. We decided to remove it completely and leave open the option of installing a see-thru direct vent gas fireplace down the road.

Below you can see how the living room walls, chimney and closet have been completely removed and the new framing is in place. I chose to create 6′ wide doorways through to the kitchen on either side of the fireplace wall for an open concept look and feel.

The 2 upstairs bedrooms and the stairway leading to them were stripped down in a similar way.

Next Monday, I will show you where all this demolition leads! With the drywall in place, we can begin to visualize the overall look and design plan.

Have a great week!

Hilary

 

 

 

Posted in Interior Design | Leave a comment

Swedish Greys - a WordPress theme from Nordic Themepark.